englishdeutschfrançaischinese

Project engineering

To satisfy our customers with our quality products is not enough. It is more important to us, that you can always take advantage of our many years of technical know-how at a high level.



Whenever you have questions concerning our products and their use in your systems under your process conditions, our project engineers are at your service all over the world with their many years of professional experience.

Beginning with the planning and layout, the calculation of the operating costs up to the commissioning and maintenance - if you wish, we take on the complete task of realizing your installation.
Know-How
Using our products and our knowledge in engineering, we have been building installations for more than 30 years, ensuring the complete sequence of chemical processes in water technology: disinfection, flocculation, pH correction and water conditioning.

Customers
Our customers in this sector are end users such as communal waterworks, OEM in systems engineering, consulting and engineering offices as well as ministries. They all are international: especially in the Middle East, in the CIS states, in South America and Asia.

Performance
Our performances begin with acquisition and customers advice, extending over projecting, delivery, commissioning and training of the operator staff up to consulting on site. Yet we go a step further: we calculate the operating costs on site, i.e. the consumption of energy and chemical components and give you hints on possibilities of economy. We offer also after sales service and maintenance contracts.

• Creation of P+ID (Process + Instrumentation Drawing)
• Installation plans
• Participation in the planning of the entire building
• Planning of the sequence of the electric (PLC), the hydraulic and mechanical   processes , the measurement and control as well as the data transfer by Bus using   SCADA-systems.
• Combining all in one project.

Planning
A large installation project, as for example the » Seabank Power Station in Bristol, England, a chlorine dioxide preparation plant which was completely realized by us, has a lead time of 2 to 3 years. Its realization takes about 3 to 4 months, and 5 to 6 months later the system can be actually commissioned.

Reference projects
Our references speak for themselves:

 Application  ALLDOS Systems  Country  Year
       
 Pool Water  Disinfection for Europe's largest open-air swimming  pool  Germany  2006
 Drinking water  8 container systems for processing 10% activated
 carbon solution
 Russia  2006
 Waste water  Fully automatic chlorine gas system to clean
 membranes
 Kuwait  2005
 Drinking water  Disinfection (Chlorine gas) / Flocculation / M&C  Iraq  2005
 Drinking water  Olympia 2004 / Disinfection / Flocculation / M&C  Greece  2004
 Drinking water  Traitement de l'eau brute / Flocculation / M&C  Chile  2002
 Drinking water  Disinfection / Shock Chlorination  Turkey  2002
 Drinking water treatment  Disinfection  Uzbekistan  2001
 Waste water treatment  Flocculation  Russia  2001
 Waste water treatment  Disinfection, Measurement/Control  Kuwait  2001
 Drinking water treatment  Disinfection, Measurement/Control  Vietnam  2001
 Industrial water treatment  Disinfection, pH-control  Germany  2000
 Drinking water treatment  Disinfection, Measurement/Control  Kosovo  2000
 Drinking water treatment  Disinfection, Fluorine, Measurement/Control  Oman  2000
 Waste water treatment  Disinfection, Measurement/Control  Algeria  1999
 Cooling water treatment  Disinfection with ClO2  England  1999
 Drinking water treatment  Precipitation/Flocculation, pH-control  South Africa  1994
 Drinking water treatment  Disinfection, Precipitation/Flocculation, pH-control  Turkey  1994
 Drinking water treatment  Disinfection, Precipitation/Flocculation, pH-control  Chile  1994
 Waste water treatment  Disinfection  Korea  1993
 Drinking water treatment  Disinfection, Precipitation/Flocculation, pH-control  PR China  1993
 Drinking water treatment  Disinfection, Precipitation/Flocculation  PR China  1993
 Drinking water treatment  Disinfection  PR China  1991


Referenceproject    
  » Seabank Power Station in Bristol, England
   

More questions?
We are looking forward to answering your questions concerning project engineering.
ipm@alldos.com